Buchi Rotavapo R-250 Manual de usuario Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 46
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
19
Rotavapor R-250
4 Putting into Operation
4.13 Vacuum Controller (Accessory)
The process is carried out under vacuum to optimize evapo-
risation. The V-850/855 vacuum controller is most suitable
for control.
Installation of the vacuum controller
s 3CREW THE SUPPORT onto the upper surface of the
housing.
s 3ECURETHERETAININGRODBYINSERTINGTHESIDESOCKETHEAD
cap screws into the retainer.
s &ITTHEVACUUMCONTROLLERONTHERETAININGROD
s #ONNECTTHECABLESANDHOSESASDESCRIBEDINTHENEXT
Chapter.
s 4HEHOSESAREROUTEDFROMVACUUMCONNECTION',AT
the glass assembly (descending) or from a T-piece in the
hose (reflux) to the vacuum controller via a Y-connection
and to the pressure indicator on the front panel.
Fig. 4.18: Installation of the vacuum controller
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 45 46

Comentarios a estos manuales

Sin comentarios