
5 Putting into operation
20 V-850/855 Operation Manual, Version E
5 Putting into operation
This chapter describes how the instrument is installed and gives instructions on initial startup.
NOTE:
Inspect the instrument for damages during unpacking. If necessary, prepare a status report immedi-
ately to inform the postal company, railway company or transportation company.
Keep the original packaging for future transport.
5.1 Setting up the Rotavapor with the Vacuum Controller V-850/855
5.1.1 Installation
3
2
1
To install the vacuum controller to the Rotavapor,
proceed as follows:
• Screw the holder a for the vacuum controller
to the top of the Rotavapor.
• Slide the guide rail b of the vacuum controller
over the holder.
• Fix the vacuum controller to the holder by
tightening the knurled nut c.
Comentarios a estos manuales