Buchi PrepChrom C-700 Manual de usuario Pagina 95

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 110
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 94
BÜCHILabortechnikAG Maintenance|7
PrepChromC700 95/110
u Airpurgethesystem.
6.9 Air purge [} page85]
Tasks
u Opentheservicedoorofthepumpmodule.
u Removebothfittings(1)ontheoutletofthepump.
Thetubescannowbeliftedoffthevalveinserts(2).
Wrench3/8"
u Disconnectbothtubes(3)ontheinletofthepump.
u Removethecheckvalveinserts(2).
Wrench17mm
u Removethecheckvalvefromthecheckvalveinsert.
7.3.5.2 Checkvalve,installation
u Placethecheckvalve(2)inthecheckvalveinsert(1).
u Makesurethecheckvalvearrowshowsalwaystowardsthesolventflow
direction.
NOTE
Makesurethecheckvalveiscorrectlyinstalled,otherwisethepumpwillnot
workproperly.
Vista de pagina 94
1 2 ... 90 91 92 93 94 95 96 97 98 99 100 ... 109 110

Comentarios a estos manuales

Sin comentarios