Buchi Multivapo P-12 Manual de usuario Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 76
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
5 Putting into operation
38 Multivapor™ Operation Manual, Version E
5 Putting into operation
This chapter describes the installation of the Multivapor and gives instructions on initial start-up.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report imme-
diately to inform the postal company, railway company or transport company. Keep the original
packaging for future transport.
5.1 Installation site
Place the instrument on a stable, horizontal surface and consider the maximum product dimensions.
NOTE
The shaking platform moves horizontally in an orbital manner with up to 485 rpm (for the P-12) which
may lead to considerable shaking of the surface. For this reason ensure that the surface is stable.
It is not necessary to place the instrument in a fume hood, however, the exhaust gas from the vacuum
pump should be directed toward a fume hood.
5.2 Electrical connections
NOTICE
Risk of instrument damage by wrong mains supply.
External mains supply must meet the voltage given on the type plate
Check for sufficient grounding
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 75 76

Comentarios a estos manuales

Sin comentarios