
5|Installation BÜCHILabortechnikAG
24/60 OperationManualRotavapor®R100
5.5 Connectingthevacuumandcoolingmediatubing
Toachieveoptimumdistillation,alldevicesinthesystemshouldbematchedtoone
another.Therefore,werecommendthattheRotavapor®R100isusedtogetherwith
theBUCHIVacuumPumpV100andtheBUCHIRecirculatingChillerF100orF105
(seeChapter3.2.4"Typicalapplication",page14).
u Connectcoolingmediatubestothetwocoolantconnections(2)and(3)using
GL14capnuts.Thereisnoneedtodistinguishbetweenflowandreturnwhendo
ingso.
u Connectthevacuumtubingtothevacuumconnection(1)usingaGL14capnuts.
Comentarios a estos manuales