Buchi DuMaster D-480 Manual de usuario Pagina 231

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 356
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 230
Operation Manual D-480 ©BÜCH Labortechnik AG
8 - Maintaining the instrument 231
Note: When you close the ground-in ball-and-socket joints, you must be able to feel an elastic
resistance when you press the o-rings into the pans, otherwise you must replace the o-rings.
Place the ungreased seal on the combustion tube connection (3) at the top.
Check whether the seals are in the pans of the plugs of combustion and post combustion tube.
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Handle
2 Bayonet catch
3 Reduction tube connection
4 Post combustion tube connection
Phase 1: Installing the reaction tubes, continued
Proceed as follows:
Push the furnace back:
Lift the bayonet catch (2) slightly so as not to damage the seal on the combustion tube
connection.
Close the bayonet catch by turning the bayonet catch handle (1) to the left.
Leave the end of the reduction tube open.
Vista de pagina 230
1 2 ... 226 227 228 229 230 231 232 233 234 235 236 ... 355 356

Comentarios a estos manuales

Sin comentarios