Buchi Rotavapo R-220 SE Manual de usuario Pagina 50

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 109
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 49
5 Putting into operation
50 R-220 SE Operation Manual, Version F
a
b
c
d
e
a
Start with the distribution piece and mount it at the gearbox.
b
Proceed with the expansion vessel. Mind upright installation!
c
Use the u-shaped bridge tube to roughly align the first condenser to the expansion
vessel.
Fix the u-tube at the expansion vessel and subsequently bring in the condenser.
Fasten the condenser. Fix the tube to the condenser.
d
Use the y-shaped bridge tube to roughly align the outlet of the second condenser to the
first condenser from below.
Fix the y-piece at the first condenser outlet.
Subsequently bring in the second condenser, fasten it and fix the y-piece.
e
Align the receiving flask to the y-piece and fasten the clamp.
Vista de pagina 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 108 109

Comentarios a estos manuales

Sin comentarios